The truth! The cause of Dry back floor arching.

Author: Site Editor     Publish Time: 2020-11-26      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

PVC floor is widely used by people, because of its waterproof, formaldehyde-free and high cost-effective gradually. Every step of the construction of PVC floor is very particular. Many users are wondering why so popular PVC floor will be just completed shortly after the emergence of arch. The main reasons which causeed the PVC floor to arch are in the below:

 

1. The ground moisture is too high

The foundation ground must be dry, at which point the moisture content should be less than or equal to 3% . Otherwise, the rise of water vapor will glue dissolved, so that the glue lost adhesion, the pressure of water vapor will push up the floor, resulting in floor bulging.

 


2. Self-leveling is not completely dry

Normally, the self leveling takes 24 to 48 hours to dry, and this time can be carried out on the floor of the installing. If the construction site humidity, and is not ventilated enclosed space, drying time must be relatively extended. If the self-leveling is not completely dry on the laying of the floor, there will inevitably be a bulge phenomenon.

 


3. Temperature problem

The floor should be installed in a reasonable ambient temperature. Generally, the temperature should be kept at 15 °C as high as 32 °C; if it is lower than 15 °c, the construction should be careful; if it is lower than 8 °c, the construction should be forbidden (except special auxiliary materials) . Because in the low temperature environment, the strength of the self-leveling and the adhesive force of the Glue Drop, which leads to the floor bulge. Similarly, if construction at high temperature, the self-leveling fluidity reduced, glue accelerated curing, drying time and construction time is greatly shortened, there may have been construction time, or even there is no glue behind the floor, resulting in bulge.

 

In summary, no matter how good the quality of the floor, if there is no proper installation and ground base, there will be some problems. We are committed to solving the user's various problems, so in the floor are placed in the installation instructions.


Table of Content list
Get in Touch with Us
GO GREEN WITH PROTEX
Contact Us
Have questions or ready to start your flooring journey with Protex? Reach out to us! Our dedicated team is here to assist you. Choose your preferred method of contact: 
Phone: +86-139 1239 7749
Tel: +86 510-82719021
Add: No. 118 Laowei Industrial Area, Xinghua, Jiangsu 225768,China.
 
Click here to get Free Sample !
Get in Touch with Us
Home
Copyright © 2024 Protex Flooring Co.,Ltd. All rights reserved.    
PVC Flooring

 
 
 
 
PROTEX SINCERELY INVITE YOU TO ATTEND THE
DOMOTEX asia/CHINAFLOOR 2024
Booth No.7.2D28
Time:28 -30 MAY,2024
Place:Shanghai, China
National Exhibition and convention center