Ground cleaning before PVC floor construction

Views: 74     Author: Site Editor     Publish Time: 2023-01-13      Origin: Site

Before the construction of vinyl floor, the ground should be cleaned first, and the surface should be free of sand, dust and oil, otherwise the adhesive is not easy to stick. Also, the adhesive before construction and the materials for floor decoration should be placed in a warm place, which can restore the elasticity of the indentation of the packaging, and also be beneficial to the relaxation of the adhesive's construction performance, so as to preserve the integrity of the product's performance.


The fall of the flatness of the floor should be within 2mm. For the tile floor, we should pay attention to that the spacing of the tile joints should be within 2mm, and there is no high and low drop between the bricks. In this case, PVC floor can be laid directly. If the brick joint is larger than 2mm, the ground must be self-leveled first.


The fall of the flatness of the floor should be within 2mm. For the tile floor, we should pay attention to that the spacing of the tile joints should be within 2mm, and there is no high and low drop between the bricks. In this case, PVC floor can be laid directly. If the brick joint is larger than 2mm, the ground must be self-leveled first.

Table of Content list
CONTACT US

Quick Links

Product Category

Contact Information

 Phone: +86-139 1239 7749
 Tel: +86 510-82719021
 E-mail: info@protexflooring.com
 Add: No. 118 Laowei Industrial Area, Xinghua, Jiangsu 225768,China.
Click here to get Free Sample !
© 2020 Protex Flooring Co.,Ltd. All rights reserved.