Offering investment operations manual to support your business in our industry.
Profession creates perfection
  • Product Name
  • Product Keyword
  • Product Model
  • Product Summary
  • Product Description
  • Multi Field Search
You are here: Home / Solutions
SOLUTIONS
HOW WE WORK FOR CUSTOMERS :
Nearly 300 new designs and color will be launched each year.
Two business trips a year to better meet customers' needs. 
Weekely Order Follow Up to let customers know the order status in time.
In production and Preshipment Report.
Required flexible delivery time.
INSTALLATION :
HOW TO DISENGAGE
Always start by disengaging on the long side.
Grab the planks with both hands and gently lift at the same time until the planks disengage.
Place the planks gently on the floor.
To disengage on the short side, slide the planks the opposite direction.
Press the planks gently while sliding.
Continue sliding until the planks are fully separated.
HOW TO ENGAGE
Start by engaging the plank on the long side(angle-system)
Slide de plank until it reaches the short, side of the next plank and drop gently.
Press with your thumb on both ends of the short side.
Continue pressing until you hear the “click”, sound of the one piece drop-lock system.
Hit gently with a soft-faced hammer on both sides of the short end.
Planks are now fully locked.

Quick Links

Product Category

Contact Information

 Phone: +86-138-0618-8607
 Tel: +86 510-82719021
 E-mail: info@protexflooring.com
 Add: Unit 2108, No. 307 Guangnan Road,Liangxi Dist., Wuxi,Jiangsu 214011,China.
Subscribe to our email and become the first person to learn about our latest product.
© 2018 Protex International Limited. All rights reserved.